Scope

Assembly of two 345 ft Pyramax transmission river crossing towers with the use of an air crane.

Customer

Irby Construction, Dashiell, Entergy Louisiana

Date

August 2023

In 2023, Entergy Louisiana sought to build 15 miles of transmission line consisting of 150 new pole structures. Included in the project were two structures on either side of the Calcasieu river that could withstand hurricane force winds up to 175 mph.

The two river crossing structures to be built were 345ft tall, exceeding the capabilities of cranes on the ground and requiring the use of a helicopter to assemble. Gulf Services was enlisted to create a detailed plan for constructing the towers. With just 28 days on the schedule with the air crane, along with a short time frame for receiving, organizing, and repairing the tower components, Gulf Services faced numerous challenges…

Let’s work together.

Click below to get in touch and discuss your next project.